SOLAR Β· OPERATIONAL

Rowles

Rowles is a 12.8 MW solar farm in South East England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South East
  • England

Key facts

Installed capacity
12.8 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
South East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
OX25 3QQ
Coordinates
51.8441, -1.2258

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Rowles compares

97th of 662largest solar farms in the UK register
18th of 105in South East
0.23%of listed UK solar farms capacity
β‰ˆ 11 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 12.8 MW station would generate roughly 11 GWh of electricity in a year, similar to the annual use of about 4,140 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South East All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Rowles Farm solar park
Developer / operator
United Photovoltaics
Planning authority
Cherwell
Planning reference
13/01027/F
Application submitted
9 July 2013
Permission granted
17 April 2014
Construction started
1 December 2014
Began operating
14 March 2015
Capacity in planning record
13 MW
Address
Land At Rowles Farm Bletchingdon Oxfordshire, Oxfordshire, OX5
REPD reference
1671

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026