SOLAR Β· OPERATIONAL

Morfa

Morfa is a 2 MW solar farm in Wales, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Wales
Project stageOperating
  1. PlanningJul 2015 (completed)
  2. ConsentedOct 2015 (completed)
  3. ConstructionJan 2016 (completed)
  4. OperatingMar 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
2 MW
Status
Operational
Technology
Solar Β· PV
Operator
Lightsource BP
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CF61 2YT
Coordinates
52.5900, -4.0967

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Morfa compares

608th of 662largest solar farms in the UK register
71st of 75in Wales
0.04%of listed UK solar farms capacity
β‰ˆ 1.8 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 2 MW station would generate roughly 1.8 GWh of electricity in a year, similar to the annual use of about 650 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Wales All run by Lightsource BP

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Land at Morfa Camp
Developer / operator
Novus Solar Developments
Planning authority
Gwynedd
Planning reference
C15/0662/09/LL
Application submitted
1 July 2015
Permission granted
19 October 2015
Construction started
5 January 2016
Began operating
20 March 2016
Capacity in planning record
2.8 MW
Address
Land at Morfa Camp, Sandilands, Tywyn, Gwynedd, Gwynedd, LL36 9BH
REPD reference
5389

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.