SOLAR Β· OPERATIONAL

Far Danes

Far Danes is a 11.7 MW solar farm in East Midlands England, operated by WPO UK Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England
Project stageOperating
  1. PlanningOct 2014 (completed)
  2. ConsentedDec 2014 (completed)
  3. ConstructionNov 2015 (completed)
  4. OperatingMar 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
11.7 MW
Status
Operational
Technology
Solar Β· PV
Operator
WPO UK Services
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
53.3224, -0.6975

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Far Danes compares

113th of 662largest solar farms in the UK register
23rd of 95in East Midlands
0.21%of listed UK solar farms capacity
β‰ˆ 10 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 11.7 MW station would generate roughly 10 GWh of electricity in a year, similar to the annual use of about 3,800 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by WPO UK Services

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Danes Farm - extension
Developer / operator
Freewatt Renewable Energy
Planning authority
West Lindsey
Planning reference
131968
Application submitted
23 October 2014
Permission granted
4 December 2014
Construction started
11 November 2015
Began operating
11 March 2016
Capacity in planning record
10.5 MW
Address
Stow Park Road, Stow, Lincoln, Lincolnshire, LN1 2AJ
REPD reference
1525

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.