Blackwell Grange
Blackwell Grange is a 4.98 MW solar farm in West Midlands England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- West Midlands
- England
Key facts
- Installed capacity
- 4.98 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- West Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- CV36 4PF
- Coordinates
- 52.0879, -1.6673
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Blackwell Grange compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.98 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in West Midlands All run by AnescoNearby generating sites
- Five Mile Drive Β· 3.91 MW solar farm12.0 km
- Springhill Β· 4.95 MW solar farm12.0 km
- The Leys Β· 4.98 MW solar farm13.1 km
- Poplars Β· 4.98 MW solar farm13.1 km
- The Rushes Β· 4.98 MW solar farm13.5 km
- The Beeches Β· 5 MW solar farm13.7 km
- Brookside Β· 5 MW solar farm13.7 km
- Epwell Β· 8.99 MW solar farm14.0 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Blackwell Grange Solar Farm
- Developer / operator
- Conergy
- Planning authority
- Stratford-on-Avon
- Planning reference
- 14/01732/FUL
- Application submitted
- 21 July 2014
- Permission granted
- 1 March 2016
- Construction started
- 15 December 2016
- Began operating
- 15 March 2017
- Capacity in planning record
- 5 MW
- Address
- Land To North Of Ilmington Road Blackwell, Warwickshire
- REPD reference
- 1968
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.