Beech Farm

Beech Farm is a 4.3 MW solar farm in South West England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South West
  • England
Project stageOperating
  1. PlanningJul 2015 (completed)
  2. ConsentedAug 2015 (completed)
  3. ConstructionMay 2016 (completed)
  4. OperatingFeb 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.3 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SN6 7SE
Coordinates
51.6107, -1.7415

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Beech Farm compares

512th of 662largest solar farms in the UK register
126th of 192in South West
0.08%of listed UK solar farms capacity
β‰ˆ 3.8 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.3 MW station would generate roughly 3.8 GWh of electricity in a year, similar to the annual use of about 1,400 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South West All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Land at Beech Farm
Developer / operator
Vortex (formerly SunEdison)
Planning authority
Swindon
Planning reference
S/LDO/15/1133
Application submitted
6 July 2015
Permission granted
28 August 2015
Construction started
1 May 2016
Began operating
17 February 2016
Capacity in planning record
4.6 MW
Address
Beech Farm, Stanton, Fitzwarren, Swindon, Wiltshire
REPD reference
5253

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.