Every solar farm in the UK government's register of power stations, with its capacity, operator and location. Each site page merges the government's operating record with its planning history where the two match.

Matching sites10
Capacity49 MW
England562
Wales75

Planning, consented, under-construction and stopped projects open in the project pipeline.

UK solar farms
662 sites5.6 GW installed

Largest matching sites by capacity

  1. Belper5 MW
  2. Guisborough5 MW
  3. Hunger Hill5 MW
  4. Low Burntoft5 MW
  5. Peterlee5 MW

Capacity by nation click to filter

Map: solar farms in North East

10 sites mapped
Solar farms Circle size shows capacity. The filters below narrow the map and the list together.
Clear
SiteCapacityStageRegionOperator
Belper 5 MW Operating North East Greencoat Capital
Guisborough 5 MW Operating North East Octopus Investments
Hunger Hill 5 MW Operating North East Greencoat Capital
Low Burntoft 5 MW Operating North East Anesco
Peterlee 5 MW Operating North East Octopus Investments
School Aycliffe 5 MW Operating North East Lightsource BP
Blue House 4.98 MW Operating North East Anesco
Greencroft 4.93 MW Operating North East Anesco
Woodhouse PV 4.88 MW Operating North East European Energy A/S
High Meadow 3.89 MW Operating North East Anesco
Page 1 of 1 Β· 10 sites

Largest operators

All operators β†’

More on uk solar farms

This list covers sites in operation. Proposals, consented schemes and sites under construction are in the project pipeline. For how the technology works, see the guide.

Source: Department for Energy Security and Net Zero, Digest of UK Energy Statistics (DUKES) table 5.11, and the Renewable Energy Planning Database. Capacities are installed capacity, not live output.