SOLAR Β· OPERATIONAL

Peterlee

Peterlee is a 5 MW solar farm in North East England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • North East
  • England
Project stageOperating
  1. PlanningJul 2015 (completed)
  2. ConsentedJan 2016 (completed)
  3. ConstructionJan 2016 (completed)
  4. OperatingMar 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
5 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
North East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SR8 3UJ
Coordinates
54.7752, -1.3655

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Peterlee compares

252nd of 662largest solar farms in the UK register
1st of 10in North East
0.09%of listed UK solar farms capacity
β‰ˆ 4.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in North East All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Peterlee Solar Farm
Developer / operator
Zaravolt Development
Planning authority
County Durham
Planning reference
DM/15/02290/FPA
Application submitted
23 July 2015
Permission granted
14 January 2016
Construction started
15 January 2016
Began operating
30 March 2016
Capacity in planning record
5 MW
Address
Land North Of Mill Hill, North West Industrial Estate, Peterlee, County Durham, SR8 2H
REPD reference
5694

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.