Hare Hill
Hare Hill is a 2.3 MW onshore wind farm in North East England, operated by RWE Npower. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- North East
- England
Key facts
- Installed capacity
- 2.3 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- RWE Npower
- Region
- North East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- DH6 2BA
- Coordinates
- 54.7577, -1.3411
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Hare Hill compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 2.3 MW station would generate roughly 5.2 GWh of electricity in a year, similar to the annual use of about 1,940 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in North East All run by RWE NpowerNearby generating sites
- Hare Hill RO Β· 2.75 MW onshore wind farm0.0 km
- Peterlee Β· 5 MW solar farm2.5 km
- Haswell Moor Circuit 1 Β· 5.15 MW onshore wind farm4.5 km
- Haswell Moor Circuit 2 Β· 5.15 MW onshore wind farm4.5 km
- High Haswell Wind Farm Β· 4 MW onshore wind farm6.7 km
- High Volts RO Β· 5.5 MW onshore wind farm7.6 km
- High Volts Β· 2.3 MW onshore wind farm7.6 km
- Trimdon Β· 5.2 MW onshore wind farm7.7 km
Also operated by RWE Npower
RWE Npower operates 90 sites in the register. Largest first:
- Pembroke Β· gas-fired power station2,199 MW
- Didcot A Power Station Β· coal-fired power station2,000 MW
- Staythorpe Β· CCGT gas power station1,828 MW
- Didcot B Β· gas-fired power station1,450 MW
- Tilbury B Power Station Β· coal-fired power station1,050 MW
- Triton Knoll Β· offshore wind farm857 MW
- Little Barford Β· CCGT gas power station735 MW
- London Array Β· offshore wind farm630 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- E.ON UK
- Planning authority
- County Durham
- Application submitted
- 11 February 2000
- Permission granted
- 25 May 2000
- Began operating
- 1 July 2004
- Capacity in planning record
- 1.3 MW
- Address
- Harehill Farm, Haswell Plough, County Durham, County Durham
- REPD reference
- 3496
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.