πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Octary Β· UK solar farms

Greencoat Capital: solar farms in North West

Every solar farm in the UK government's register of power stations, with its capacity, operator and location. Each site page merges the government's operating record with its planning history where the two match.

Matching sites10
Capacity61 MW
England562
Wales75

Planning, consented, under-construction and stopped projects open in the project pipeline.

UK solar farms
662 sites5.6 GW installed

Largest matching sites by capacity

  1. Gedulah18.3 MW
  2. Shuttleworth5 MW
  3. Arnawood4.99 MW
  4. Bent Spur4.99 MW
  5. Bilsborrow4.99 MW

Capacity by nation click to filter

Map: greencoat Capital: solar farms in North West

10 sites mapped
Solar farms Circle size shows capacity. The filters below narrow the map and the list together.
Clear

Operator: Greencoat Capital Β· remove

SiteCapacityStageRegionOperator
Gedulah 18.3 MW Operating North West Greencoat Capital
Shuttleworth 5 MW Operating North West Greencoat Capital
Arnawood 4.99 MW Operating North West Greencoat Capital
Bent Spur 4.99 MW Operating North West Greencoat Capital
Bilsborrow 4.99 MW Operating North West Greencoat Capital
Clay Cross 4.99 MW Operating North West Greencoat Capital
FannyHouse 4.94 MW Operating North West Greencoat Capital
Moor House 4.92 MW Operating North West Greencoat Capital
Wrea Green 4.88 MW Operating North West Greencoat Capital
Carver Hey 2.51 MW Operating North West Greencoat Capital
Page 1 of 1 Β· 10 sites

More on uk solar farms

This list covers sites in operation. Proposals, consented schemes and sites under construction are in the project pipeline. For how the technology works, see the guide.

Source: Department for Energy Security and Net Zero, Digest of UK Energy Statistics (DUKES) table 5.11, and the Renewable Energy Planning Database. Capacities are installed capacity, not live output.