NESO TEC REGISTER Β· GREAT BRITAIN

Interconnector projects in the connection queue on the SP Transmission (south Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown21.2 GW in total
In planning1scoping or awaiting consent
Consented or building0closest to connecting
Built1connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

2 projects
ProjectCapacityStageConnection siteFrom
LIRIC Interconnector
Interconnector Β· TI LIRIC Limited
700 MWScoping Hunterston East 400kV
SP Transmission (south Scotland)
Oct 2032
Auchencrosh (interconnector CCT)
Interconnector Β· Moyle Interconnector Limited
500 MWBuilt Auchencrosh 275kV
SP Transmission (south Scotland)

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed β€œconnection nodes” are listed but not mapped.