Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown8443 MW in total
In planning6scoping or awaiting consent
Consented or building12closest to connecting
Built11connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

8 projects
ProjectCapacityStageConnection siteFrom
Recell at Penrhos (BEGA)
Other Β· Recell Energy Bloom Developments Limited
210 MWConsents Approved Penrhos GSP
National Grid (England & Wales)
Oct 2027
Recell at Penrhos (BEGA)
Other Β· Recell Energy Bloom Developments Limited
150 MWConsents Approved Penrhos GSP
National Grid (England & Wales)
Oct 2025
Shbec
Other Β· Ttep Shb Ltd
83 MWConsents Approved South Humber Bank 400kV Substation
National Grid (England & Wales)
Jul 2029
Cilfynydd Grid Stability Services
Other Β· Cilfynydd Grid Services Limited
0 MWConsents Approved Cilfynydd 400kV Substation
National Grid (England & Wales)
Mar 2027
Eye Grid Services Facility
Other Β· Conrad (Eye) Limited
0 MWConsents Approved Yaxley 400kV Substation
National Grid (England & Wales)
Dec 2025
Sellindge Grid Stability Services
Other Β· Sellindge Grid Services Limited
0 MWConsents Approved Sellindge 400kV Substation
National Grid (England & Wales)
Aug 2026
Swansea Greener Grid Park - Connection 2
Other Β· Swansea Grid Solutions Limited
0 MWConsents Approved Swansea North 400kV Substation
National Grid (England & Wales)
Jul 2025
Walpole Grid Services Facility
Other Β· Conrad (Walpole) Limited
0 MWConsents Approved Walpole 400kV Substation
National Grid (England & Wales)
Jul 2026

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed β€œconnection nodes” are listed but not mapped.