Grid infrastructure βΊ Connection queue βΊ Other
OTHER Β· NGETShbec
Shbec is a 83 MW other project consented, connecting to the National Grid (England & Wales) network at South Humber Bank 400kV Substation, with capacity due from July 2029. The connection agreement is held by Ttep Shb Ltd.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Jul 2029 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-001096
- Customer
- Ttep Shb Ltd
- Technology
- Waste
- Total capacity
- 83 MW
- Change in this agreement
- +83 MW
- Capacity effective from
- 1 July 2029
- Connection site
- South Humber Bank 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Consents Approved
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at South Humber Bank 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem