Grid infrastructure › Connection queue › Gas
GAS · NGETSouth Humber Bank
South Humber Bank is a 1.4 GW gas project built and connected, connecting to the National Grid (England & Wales) network at South Humber Bank 400kV Substation. The connection agreement is held by EP UK Power Development II Ltd.
Connection details
- NESO project number
- PRO-000366
- Customer
- EP UK Power Development II Ltd
- Technology
- CCGT (Combined Cycle Gas Turbine)
- Total capacity
- 1.4 GW
- Already connected
- 1.4 GW
- Change in this agreement
- +35 MW
- Capacity effective from
- 30 October 2039
- Connection site
- South Humber Bank 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at South Humber Bank 400kV Substation