NESO TEC REGISTER · GREAT BRITAIN

Battery storage projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown10422.7 GW in total
In planning609scoping or awaiting consent
Consented or building126closest to connecting
Built79connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

104 projects · page 3 of 3
ProjectCapacityStageConnection siteFrom
MeyGen Tidal
Battery storage · Meygrid Limited
28 MWConsents Approved Gills Bay GSP
SSEN Transmission (north Scotland)
Apr 2027
Tarland Battery Storage System
Battery storage · Tarland Limited
20 MWConsents Approved Tarland 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2026
Elvanfoot (9.8 MW) Energy Storage
Battery storage · Elvanfoot Energy Storage Limited
9.8 MWConsents Approved Elvanfoot 400/275/33kV
SP Transmission (south Scotland)
Apr 2027
Necton Greener Grid Park
Battery storage · Necton Grid Solutions Limited
0 MWConsents Approved Necton 400kV Substation
National Grid (England & Wales)
Oct 2026
Page 3 of 3

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.