🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content Skip to project content
GENERATION · NETWORKS · ELECTRICITY DEMAND

All energy projects

Explore operating assets, construction and proposals across the electricity system. Find the capacity, planning status and evidence behind each project.

11,163Matching project records
3,152Operating records
477Construction or enabling works
July 2026Official renewable register edition
DESNZ tracks projects over 150 kW, with limitations for smaller historical projects. Rows represent planning records and may include linked applications, extensions and separate storage phases. Do not sum them as a definitive national fleet total.
Reset filters

Project map

Use the map to explore the matching projects. Solid markers show published or mapped points; shaded dashed circles show approximate areas. Cable endpoints are shown separately.

Loading OpenStreetMap…

11,163 results

Understand capacity and annual energy →
Transmission links

Eastern Green Link 1 (Torness–Hawthorn Pit)

Under construction
2,000 MW

Transfer capacity

East Lothian / County Durham · United Kingdom

SP Energy Networks / National Grid

Onshore construction was announced in February 2025. EGL1 connects the Torness area to Hawthorn Pit over a predominantly subsea route of more than 190 km. It is distinct from EGL2 and does not terminate at Drax.

Transmission links

Eastern Green Link 2 (Peterhead–Drax)

Under construction
2,000 MW

Transfer capacity

Aberdeenshire / North Yorkshire · United Kingdom

SSEN Transmission / National Grid

EGL2 links Peterhead and Drax through a 505 km HVDC route. Construction is underway following the 2024 approvals. Its converters connect the subsea DC system to the AC transmission networks at each end. It transfers electricity between regions; its rating is not additional generating capacity.

Transmission links

Eastern Green Link 3 (Peterhead–West Norfolk)

In planning
2,000 MW

Transfer capacity

Aberdeenshire / Lincolnshire / Norfolk · United Kingdom

SSEN Transmission / National Grid

Major converter and cable contracts were announced in March 2026. Planning and consultation continue. EGL3 and EGL4 share proposed English landfall and cable corridors, with separate converter stations in the Walpole area. Contract awards are not evidence that the complete link is already under construction.

Transmission links

Eastern Green Link 4 (Fife–West Norfolk)

In planning
2,000 MW

Transfer capacity

Fife / Lincolnshire / Norfolk · United Kingdom

SP Energy Networks / National Grid

Supply-chain agreements were announced in March 2026. Main construction is expected in 2028 subject to consent, with completion scheduled for 2033. The proposed English converter is in West Norfolk; older descriptions of a Lincolnshire endpoint can confuse the cable landfall with the grid connection.

GRID CONTEXT

Great Britain electricity now

Explore the grid →
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.

The wider power system

Explore conventional and nuclear power stations, grid connections, renewable technology guides and source updates.

Read the scope, licences and refresh schedule