| OCSD |
4.9 MW 33 MWh |
Operating |
CA Orange |
Hybrid-Electric Building Technologies West Los Angeles 1, LLC |
2019 |
| SunAnza |
4.4 MW 9 MWh |
Operating |
CA Riverside |
Arizona Electric Pwr Coop Inc |
2022 |
| Redemeyer Road Solar |
4.0 MW 16 MWh |
Operating |
CA Mendocino |
RPCA Solar 10, LLC |
2026 |
| Madena 3 |
3.9 MW |
Under construction |
CA Yuba |
ZGlobal Inc |
2026 |
| Cadillac Battery Energy Storage Facility |
3.5 MW 9 MWh |
Operating |
CA Los Angeles |
Southern California Edison Co |
2024 |
| Yorktown Battery Energy Storage Facility |
3.5 MW 9 MWh |
Operating |
CA Los Angeles |
Southern California Edison Co |
2024 |
| EnerSmart Mesa Heights Sub Station |
3.0 MW |
Under construction |
CA San Diego |
EnerSmart Storage |
2026 |
| Gardenia 1 |
3.0 MW |
In planning |
CA Kings |
ZGlobal Inc |
2027 |
| Merced BESS |
3.0 MW |
Under construction |
CA Merced |
ZGlobal Inc |
2026 |
| SEPV Cuyama Hybrid |
3.0 MW 12 MWh |
Operating |
CA Santa Barbara |
SEPV Cuyama, LLC |
2023 |
| Wildcat I Energy Storage LLC |
3.0 MW 12 MWh |
Operating |
CA Riverside |
Wildcat I Energy Storage LLC |
2021 |
| Google Bayhill Solar PV and Microgrid |
2.6 MW 5 MWh |
Operating |
CA San Mateo |
Google, Inc. |
2024 |
| RITC Solar and Battery Rooftop System |
2.6 MW 8 MWh |
Operating |
CA Los Angeles |
City of Burbank Water and Power - (CA) |
2026 |
| CSU Long Beach |
2.5 MW 15 MWh |
Operating |
CA Los Angeles |
Hybrid-Electric Building Technologies West Los Angeles 1, LLC |
2017 |
| Amazon SAN3 Solar Project |
2.4 MW 9 MWh |
Operating |
CA San Diego |
Solar Star Prime 4 LLC |
2024 |
| Redlands DC 9 - sline609 |
2.4 MW |
Under construction |
CA San Bernardino |
Prologis Logistics Services Incorporated |
2026 |
| Fresno-Clovis RWRF |
2.3 MW 2 MWh |
Operating |
CA Fresno |
Forefront Power, LLC |
2025 |
| Redwood Coast Airport Microgrid |
2.2 MW 9 MWh |
Operating |
CA Humboldt |
Redwood Coast Energy Authority |
2021 |
| Orange Coast College PH2 Solar Project |
2.1 MW 4 MWh |
Operating |
CA Orange |
Solar Star Coastal Pirate, LLC |
2022 |
| Acorn I Energy Storage LLC |
2.0 MW 6 MWh |
Operating |
CA Ventura |
Acorn I Energy Storage LLC |
2021 |
| Blackwell?s Corner Storage Facility |
2.0 MW 9 MWh |
Operating |
CA Kern |
Blackwell Test Facility, LLC |
2025 |
| CA Riverside 2356 Fleetwood Dr. |
2.0 MW |
Under construction |
CA Riverside |
Catalyze Riverside 2356 Fleetwood Drive Microgrid LLC |
2026 |
| Downey |
2.0 MW 13 MWh |
Operating |
CA Los Angeles |
Hybrid-Electric Building Technologies West Los Angeles 1, LLC |
2019 |
| Genentech-Oceanside Hybrid |
2.0 MW 2 MWh |
Operating |
CA San Diego |
Tesla Inc. |
2016 |
| Glendale Battery Energy Storage System |
2.0 MW 1 MWh |
Operating |
CA Los Angeles |
City of Glendale - (CA) |
2017 |
| Lathrop 4 - SLCVA204 |
2.0 MW 2 MWh |
Operating |
CA San Joaquin |
Prologis Logistics Services Incorporated |
2026 |
| Merced 2 BESS |
2.0 MW 8 MWh |
Operating |
CA Merced |
ZGlobal Inc |
2026 |
| San Diego International Airport BESS |
2.0 MW 4 MWh |
Operating |
CA San Diego |
Critical Loop, Inc. |
2021 |
| Six Flags Magic Mountain |
2.0 MW |
Under construction |
CA Los Angeles |
Magic Mountain Parkway Solar Project 2023, LLC |
2026 |
| Vanadium Redox Flow Battery Plant |
2.0 MW 8 MWh |
Operating |
CA San Diego |
SDGE Batteries |
2017 |
| Amazon Bakersfield 1 Solar Project |
1.6 MW 6 MWh |
Operating |
CA Kern |
Solar Star Prime 3, LLC |
2024 |
| Allergan |
1.5 MW 9 MWh |
Operating |
CA Orange |
Hybrid-Electric Building Technologies West Los Angeles 1, LLC |
2019 |
| Borrego Springs Energy Storage |
1.5 MW 5 MWh |
Operating |
CA San Diego |
SDGE Batteries |
2012 |
| CA Bloomington 2551 S Lilac Avenue Micro |
1.5 MW |
Under construction |
CA San Bernardino |
Catalyze Bloomington 2551 S Lilac Avenue Microgrid LLC |
2026 |
| CA Manteca 730 Spreckels Ave |
1.5 MW 3 MWh |
Operating |
CA San Joaquin |
Catalyze Manteca 730 Spreckels Avenue Microgrid LLC |
2024 |
| Jade Solar 3 |
1.5 MW |
In planning |
CA Madera |
ZGlobal Inc |
2027 |
| Long Beach Convention Center |
1.5 MW 9 MWh |
Operating |
CA Los Angeles |
Hybrid-Electric Building Technologies West Los Angeles 1, LLC |
2019 |
| Springbok 3 Solar Farm Hybrid |
1.5 MW 2 MWh |
Operating |
CA Kern |
64KT 8me LLC |
2019 |
| Tracy 18 - SLCVA418 |
1.5 MW 1 MWh |
Operating |
CA San Joaquin |
Prologis Logistics Services Incorporated |
2026 |
| CA- US Foods- La Mirada |
1.4 MW 3 MWh |
Operating |
CA Los Angeles |
Generate USF La Mirada, LLC |
2026 |
| DESI-2 Battery Storage Facility |
1.4 MW 4 MWh |
Operating |
CA Orange |
Southern California Edison Co |
2019 |
| Foster Clean Power A |
1.3 MW 5 MWh |
Operating |
CA Humboldt |
Foster Clean Power A, LLC |
2025 |
| SOCCD |
1.3 MW 7 MWh |
Operating |
CA Orange |
Hybrid-Electric Building Technologies West Los Angeles 1, LLC |
2019 |
| Tracy Linne |
1.3 MW 3 MWh |
Operating |
CA San Joaquin |
Pacifico Tracy Linne LLC |
2026 |
| Baker |
1.2 MW 6 MWh |
Operating |
CA Orange |
Hybrid-Electric Building Technologies West Los Angeles 1, LLC |
2019 |
| CA- US Foods- Livermore |
1.2 MW 2 MWh |
Operating |
CA Alameda |
EDPRNA DG CA Livermore LLC |
2024 |
| Foster Clean Power B |
1.2 MW 5 MWh |
Operating |
CA Humboldt |
Foster Clean Power B LLC |
2025 |
| Lakeview Battery Storage Facility |
1.2 MW 5 MWh |
Operating |
CA Kern |
AFTW Storage, LLC |
2024 |
| Bishop Ranch - BR 2600 |
1.1 MW 2 MWh |
Operating |
CA Contra Costa |
Camino Ramon BR 2600 Solar Project 2020, LLC |
2025 |
| Gilead Sciences La Verne Rooftop Solar |
1.1 MW 2 MWh |
Operating |
CA Los Angeles |
Gilead Sciences, Inc. - La Verne |
2021 |