United States βΊ Power plants βΊ Oil-fired power plants βΊ South Carolina
OCTARY USA Β· OIL-FIRED POWER PLANTSOil-fired power plants in South Carolina
Petroleum-fired generators in the United States, mostly back-up, peaking and island supply. Click a state to drill down, or search near a place.
Operating15plants
Operating capacity297 MWnameplate
Under construction0.0 MW0 plants
Whole pipeline114 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
16 plants
| Plant | Capacity | Stage |
|---|---|---|
| Hilton Head | 118 MW | |
| Winyah | 114 MW | In planning |
| Myrtle Beach | 112 MW | |
| North Road Peak | 14.0 MW | |
| Seneca City of | 10.0 MW | |
| City West Diesel Plant | 7.2 MW | |
| Webb Forging | 5.8 MW | |
| Pacolet Diesel Generation Facility | 5.4 MW | |
| Spartanburg Water System | 4.3 MW | |
| Central Plant | 4.1 MW | |
| MCRD Parris Island PV Hybrid | 3.5 MW | |
| Honea Path | 2.9 MW | |
| Sediver | 2.9 MW | |
| Thermal Kem | 2.9 MW | |
| Valenite | 2.9 MW | |
| Rocky River (SC) | 1.3 MW |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- South Carolina Public Service Authority3 plants Β· 343 MW
- Central Electric Power5 plants Β· 17.4 MW
- City of Orangeburg - (SC)1 plants Β· 14.0 MW
- Lockhart Power Co2 plants Β· 12.6 MW
- City of Seneca - (SC)1 plants Β· 10.0 MW
- Spartanburg Commissioners PW1 plants Β· 4.3 MW
- Bob Jones University1 plants Β· 4.1 MW
- Ameresco Federal Solutions1 plants Β· 3.5 MW
- City of Abbeville - (SC)1 plants Β· 1.3 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map