🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Oil-fired power plants › South Carolina

OIL-FIRED POWER PLANTS

Sediver

Sediver is a 2.9 MW operating oil-fired power plant in York County, South Carolina, operated by Central Electric Power.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJul 2003 (current stage)
  5. Closed (not yet reached)

This plant has generators at more than one stage; see the table below.

Open in Google MapsMore oil-fired power plants in South Carolina

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
1Petroleum Liquids2.9 MW OperatingJul 2003
ST1SNatural Gas Fired Combined Cycle190 MW Cancelled or postponed
CT2ANatural Gas Fired Combined Cycle165 MW Cancelled or postponed
CT2BNatural Gas Fired Combined Cycle165 MW Cancelled or postponed

Plant details

Operator
Central Electric Power
Location
York County, South Carolina
Balancing authority
DUK
Sector
Electric Utility
Capacity
Operating: 2.9 MW
Cancelled: 520 MW
First unit online
Jul 2003
EIA plant ID
7957

Location

34.9653, -81.1872

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem