United States › Power plants › Battery storage › North Carolina
BATTERY STORAGEAllen 2 BESS
Allen 2 BESS is a 167 MW planned battery storage site in Gaston County, North Carolina, operated by Duke Energy Carolinas, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jul 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Jul 2027.
Open in Google MapsMore battery storage sites in North Carolina
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| BESS1 | Batteries | 167 MW | Planned, approvals not yet sought |
Plant details
- Operator
- Duke Energy Carolinas, LLC
- Location
- Gaston County, North Carolina
- Balancing authority
- DUK
- Sector
- Electric Utility
- Capacity
- Planned: 167 MW
- EIA plant ID
- 69148
Location
35.1921, -81.0101
Nearby power plants
- Allen 1 Battery Energy Storage SystemBattery storage · 50.0 MW · 1.0 mi
- Reventure ParkBioenergy plants · 3.5 MW · 7.1 mi
- Gaston Memorial HospitalOil-fired power plants · 1.8 MW · 9.2 mi
- Mountain IslandHydroelectric plants · 60.0 MW · 9.9 mi
- CatawbaNuclear power plants · 2,410 MW · 10.3 mi
- Gastonia Solar CenterSolar farms · 4.3 MW · 10.4 mi
- Auten Road Farm, LLCSolar farms · 5.0 MW · 10.6 mi
- Pineville Delivery 2Oil-fired power plants · 1.8 MW · 10.8 mi
- Long Creek Waste Water PlantOil-fired power plants · 5.1 MW · 11.1 mi
- Gaston Solar Power PlantSolar farms · 25.0 MW · 11.4 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem