United States βΊ Power plants βΊ Oil-fired power plants βΊ Georgia
OCTARY USA Β· OIL-FIRED POWER PLANTSOil-fired power plants in Georgia
Petroleum-fired generators in the United States, mostly back-up, peaking and island supply. Click a state to drill down, or search near a place.
Operating23plants
Operating capacity1,400 MWnameplate
Under construction0.0 MW0 plants
Whole pipeline0.0 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
23 plants
| Plant | Capacity | Stage |
|---|---|---|
| McManus | 560 MW | |
| Wilson | 318 MW | |
| Robins | 184 MW | |
| Savannah River Mill | 90.0 MW | |
| Jack McDonough | 83.6 MW | |
| Walton Bainbridge Power Facility | 80.0 MW | |
| Naval Submarine Base Kings Bay | 30.0 MW | |
| State Farm Support Center East | 10.8 MW | |
| Shepherd Center | 6.0 MW | |
| South Georgia Medical Center Inc | 5.5 MW | |
| Hewlett Packard Enterprise | 5.0 MW | |
| Athens Regional Medical Center | 4.6 MW | |
| Emory Decatur Hospital | 3.9 MW | |
| Valdosta Water Treatment Plant | 3.4 MW | |
| Bank of America Plaza | 3.0 MW | |
| 191 Peachtree Tower | 2.4 MW | |
| Sun Trust Plaza | 2.4 MW | |
| Emory Hillandale Hospital | 1.6 MW | |
| YKK USA Chestney | 1.5 MW | |
| Georgia Pacific Center | 1.4 MW | |
| Inforum | 1.3 MW | |
| Atlanta Gift Mart LP | 1.2 MW | |
| Tech Square Microgrid | 0.6 MW |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Georgia Power Co5 plants Β· 1,146 MW
- Georgia-Pacific Consr Prods LP-Savannah1 plants Β· 90.0 MW
- Walton Bainbridge LLC1 plants Β· 80.0 MW
- Kings Bay Naval Base1 plants Β· 30.0 MW
- State Farm Mutual Auto Ins Co1 plants Β· 10.8 MW
- Shepherd Center1 plants Β· 6.0 MW
- Lowndes County Hospital Authority1 plants Β· 5.5 MW
- DeKalb Regional Health System2 plants Β· 5.5 MW
- SWVP Alpharetta Owners, LLC1 plants Β· 5.0 MW
- Piedmont Athens Regional Medical Center1 plants Β· 4.6 MW
- City of Valdosta - (GA)1 plants Β· 3.4 MW
- 600 Peachtree PropCo, LLC1 plants Β· 3.0 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map