United States βΊ Power plants βΊ Hydroelectric plants
OCTARY USA Β· HYDROELECTRIC PLANTSCancelled hydroelectric plants in the USA
Conventional hydro, pumped storage and hydrokinetic plants in the United States. Click a state to drill down, or search near a place.
Operating1,411plants
Operating capacity101.1 GWnameplate
Under construction17.5 MW3 plants
Whole pipeline3,031 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
28 plants
| Plant | Capacity | Stage |
|---|---|---|
| Basin Mills | 36.0 MW | Withdrawn / abandoned |
| Black Canyon | 12.5 MW | Withdrawn / abandoned |
| Tom Bevill Lock and Dam Hydroelectric | 12.0 MW | Withdrawn / abandoned |
| Montgomery L&D Hydroelectric Project | 9.5 MW | Withdrawn / abandoned |
| Sullivan CR | 9.0 MW | Withdrawn / abandoned |
| Veazie C | 8.0 MW | Withdrawn / abandoned |
| Lowell L&D Hydroelectric Project | 5.0 MW | Withdrawn / abandoned |
| Clark Canyon Hydro-Electric Facility | 4.8 MW | Withdrawn / abandoned |
| Devola L&D Hydroelectric Project | 4.0 MW | Withdrawn / abandoned |
| Malta L&D Hydroelectric Project | 4.0 MW | Withdrawn / abandoned |
| Rokeby L&D Hydroelectric Project | 4.0 MW | Withdrawn / abandoned |
| Rock Creek Dam | 3.6 MW | Withdrawn / abandoned |
| Hadley Falls | 3.5 MW | Withdrawn / abandoned |
| Joes Valley Dam | 3.4 MW | Withdrawn / abandoned |
| Beverly L&D Hydroelectric Project | 3.0 MW | Withdrawn / abandoned |
| Philo L&D Hydroelectric Project | 3.0 MW | Withdrawn / abandoned |
| Britton Powerhouse | 2.8 MW | Withdrawn / abandoned |
| Chalk Mountain Powerhouse | 2.2 MW | Withdrawn / abandoned |
| Flannagan Hydroelectric Project | 1.6 MW | Withdrawn / abandoned |
| Fresno Dam Site Water Power Project | 1.5 MW | Withdrawn / abandoned |
| Reedsport OPT Wave Park | 1.5 MW | Withdrawn / abandoned |
| Alvarado Hydro Facility | 1.4 MW | Withdrawn / abandoned |
| Loma Rica Hydroelectric Powerhouse | 1.4 MW | Withdrawn / abandoned |
| Castle Creek Hydroplant | 1.2 MW | Withdrawn / abandoned |
| Riverside Holyoke | 1.1 MW | Withdrawn / abandoned |
| Mill Pond Hydro | 0.5 MW | Withdrawn / abandoned |
| Ninth Street Hydropower Project | 0.4 MW | Withdrawn / abandoned |
| Four Mile Hydropower Project | 0.1 MW | Withdrawn / abandoned |
Operating capacity by state
Click a state to drill down.
AK482MWME694MWVT327MWNH516MWWA21GWID2.7GWMT2.7GWND583MWMN218MWIL37MWWI526MWMI2.3GWNY5.9GWRI4MWMA2.1GWOR8GWNV1.1GWWY302MWSD1.6GWIA183MWIN108MWOH123MWPA2.4GWNJ465MWCT149MWCA14GWUT264MWCO1.2GWNE329MWMO1.1GWKY1.1GWWV371MWVA3.9GWMD551MWDEβAZ2.9GWNM82MWKS7MWAR1.3GWTN4.2GWNC2GWSC4.4GWDCβOK1GWLA192MWMSβAL3.3GWGA3.6GWHI28MWTX715MWFL44MW
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Versant Power2 plants Β· 44.0 MW
- Rye Development7 plants Β· 32.5 MW
- U S Bureau of Reclamation1 plants Β· 12.5 MW
- Energy Resources USA, Inc.1 plants Β· 12.0 MW
- PUD No 1 of Pend Oreille County - (WA)1 plants Β· 9.0 MW
- Pacific Gas & Electric Co.3 plants Β· 8.6 MW
- Clark Canyon Hydro, LLC1 plants Β· 4.8 MW
- City of Holyoke Gas and Elec Dept - (MA)2 plants Β· 4.6 MW
- City of Bountiful - (UT)1 plants Β· 3.4 MW
- Jordan Hydroelectric LTD PTP1 plants Β· 1.6 MW
- Reedsport OPT Wave Park LLC1 plants Β· 1.5 MW
- Alpine Pacific Utilities Hydro1 plants Β· 1.5 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map