🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Hydroelectric plants › Ohio

HYDROELECTRIC PLANTS

Beverly L&D Hydroelectric Project

Beverly L&D Hydroelectric Project is a 3.0 MW cancelled hydroelectric plant in Washington County, Ohio, operated by Rye Development.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore hydroelectric plants in Ohio

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
NA1Conventional Hydroelectric1.5 MW Cancelled or postponed
NA2Conventional Hydroelectric1.5 MW Cancelled or postponed

Plant details

Operator
Rye Development
Location
Washington County, Ohio
Balancing authority
PJM
Sector
IPP Non-CHP
Capacity
Cancelled: 3.0 MW
EIA plant ID
62403

Location

39.5551, -81.6465

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem