πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Gas power plants β€Ί Florida

OCTARY USA Β· GAS POWER PLANTS

Cancelled gas power plants in Florida

Natural gas power plants in the United States: combined cycle, combustion turbines, engines and steam units. Click a state to drill down, or search near a place.

Operating71plants
Operating capacity54.7 GWnameplate
Under construction612 MW1 plants
Whole pipeline612 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

15 plants
PlantCapacityStageStateOwner / operatorYear
Polk 1,859 MW Withdrawn / abandoned FL
Polk
Tampa Electric Co
Martin 1,754 MW Withdrawn / abandoned FL
Martin
Florida Power & Light Co
Midway 1,287 MW Withdrawn / abandoned FL
Taylor
Florida Power & Light Co
Hines Energy Complex 1,034 MW Withdrawn / abandoned FL
Polk
Duke Energy Florida, LLC
Tampa Electric Co NA 2 982 MW Withdrawn / abandoned FL
Hillsborough
Tampa Electric Co
Unsited 896 MW Withdrawn / abandoned FL
Florida Power & Light Co
Unnamed 580 MW Withdrawn / abandoned FL
Seminole Electric Cooperative Inc
Shady Hills Generating Station 518 MW Withdrawn / abandoned FL
Pasco
Shady Hills Power Co LLC
H L Culbreath Bayside Power Station 504 MW Withdrawn / abandoned FL
Hillsborough
Tampa Electric Co
Arvah B Hopkins 323 MW Withdrawn / abandoned FL
Leon
City of Tallahassee - (FL)
Greenland Energy Center 230 MW Withdrawn / abandoned FL
Duval
JEA
Tampa Electric Co NA 4 200 MW Withdrawn / abandoned FL
Tampa Electric Co
NA 1 195 MW Withdrawn / abandoned FL
Tampa Electric Co
Tampa Electric Co NA 3 99.0 MW Withdrawn / abandoned FL
Hillsborough
Tampa Electric Co
Midulla Generating Station 62.0 MW Withdrawn / abandoned FL
Hardee
Seminole Electric Cooperative Inc

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map