Martin

Martin is a 2,449 MW operating gas power plant in Martin County, Florida, operated by Florida Power & Light Co.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingDec 1980 (current stage)
  5. ClosedDec 2018 (not yet reached)

This plant has generators at more than one stage; see the table below.

Open in Google MapsMore gas power plants in Florida

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
8Natural Gas Fired Combined Cycle472 MW OperatingJun 2005
3STNatural Gas Fired Combined Cycle204 MW OperatingFeb 1994
4STNatural Gas Fired Combined Cycle204 MW OperatingApr 1994
3GT1Natural Gas Fired Combined Cycle204 MW OperatingFeb 1994
3GT2Natural Gas Fired Combined Cycle204 MW OperatingFeb 1994
4GT1Natural Gas Fired Combined Cycle204 MW OperatingApr 1994
4GT2Natural Gas Fired Combined Cycle204 MW OperatingApr 1994
8ANatural Gas Fired Combined Cycle188 MW OperatingJun 2001
8BNatural Gas Fired Combined Cycle188 MW OperatingJun 2001
8CNatural Gas Fired Combined Cycle188 MW OperatingJun 2005
8DNatural Gas Fired Combined Cycle188 MW OperatingJun 2005
1Petroleum Liquids935 MW RetiredDec 1980Dec 2018
2Petroleum Liquids935 MW RetiredJun 1981Dec 2018
5CCNatural Gas Fired Combined Cycle448 MW Cancelled or postponed
6CCNatural Gas Fired Combined Cycle448 MW Cancelled or postponed
5CWNatural Gas Fired Combined Cycle429 MW Cancelled or postponed
6CWNatural Gas Fired Combined Cycle429 MW Cancelled or postponed

Plant details

Operator
Florida Power & Light Co
Location
Martin County, Florida
Balancing authority
FPL
Sector
Electric Utility
Capacity
Operating: 2,449 MW
Retired: 1,869 MW
Cancelled: 1,754 MW
First unit online
Dec 1980
EIA plant ID
6043

Location

27.0536, -80.5628

Nearby power plants