United States › Power plants › Gas power plants › Florida

GAS POWER PLANTS

Arvah B Hopkins

Arvah B Hopkins is a 673 MW operating gas power plant in Leon County, Florida, operated by City of Tallahassee - (FL).

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingFeb 1970 (current stage)
  5. ClosedNov 2018 (not yet reached)

This plant has generators at more than one stage; see the table below.

Open in Google MapsMore gas power plants in Florida

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
2Natural Gas Fired Combined Cycle259 MW OperatingOct 1977
CT 2ANatural Gas Fired Combined Cycle199 MW OperatingOct 2008
GT3Natural Gas Fired Combustion Turbine61 MW OperatingSep 2005
GT4Natural Gas Fired Combustion Turbine61 MW OperatingNov 2005
IC1Natural Gas Internal Combustion Engine19 MW OperatingJan 2019
IC2Natural Gas Internal Combustion Engine19 MW OperatingJan 2019
IC3Natural Gas Internal Combustion Engine19 MW OperatingJan 2019
IC4Natural Gas Internal Combustion Engine19 MW OperatingJan 2019
IC5Natural Gas Internal Combustion Engine19 MW OperatingApr 2020
1Natural Gas Steam Turbine75 MW RetiredMay 1971Nov 2018
GT2Natural Gas Fired Combustion Turbine27 MW RetiredSep 1972May 2017
GT1Natural Gas Fired Combustion Turbine16 MW RetiredFeb 1970May 2017
5Natural Gas Fired Combined Cycle213 MW Cancelled or postponed
GT5Natural Gas Fired Combustion Turbine60 MW Cancelled or postponed
CT ANatural Gas Fired Combined Cycle50 MW Cancelled or postponed

Plant details

Operator
City of Tallahassee - (FL)
Location
Leon County, Florida
Balancing authority
TAL
Sector
Electric Utility
Capacity
Operating: 673 MW
Retired: 118 MW
Cancelled: 323 MW
First unit online
Feb 1970
EIA plant ID
688

Location

30.4522, -84.4000

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem