🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Gas power plants › Florida

GAS POWER PLANTS

Tampa Electric Co NA 2

Tampa Electric Co NA 2 is a 982 MW cancelled gas power plant in Hillsborough County, Florida, operated by Tampa Electric Co.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore gas power plants in Florida

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
1Natural Gas Fired Combustion Turbine220 MW Cancelled or postponed
2Natural Gas Fired Combustion Turbine220 MW Cancelled or postponed
5Natural Gas Fired Combustion Turbine178 MW Cancelled or postponed
6Natural Gas Fired Combustion Turbine178 MW Cancelled or postponed
3Natural Gas Fired Combustion Turbine62 MW Cancelled or postponed
4Natural Gas Fired Combustion Turbine62 MW Cancelled or postponed
7Natural Gas Fired Combustion Turbine62 MW Cancelled or postponed

Plant details

Operator
Tampa Electric Co
Location
Hillsborough County, Florida
Balancing authority
TEC
Sector
Electric Utility
Capacity
Cancelled: 982 MW
EIA plant ID
56352

Location

27.9072, -82.4231

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem