United States › Power plants › Battery storage › Florida
BATTERY STORAGEBig Bend III Battery Storage
Big Bend III Battery Storage is a 75.0 MW approved battery storage site in Hillsborough County, Florida, operated by Tampa Electric Co.
Plant statusConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Jun 2028 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Jun 2028.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| BESS1 | Batteries | 75 MW | Approved, construction not started |
Plant details
- Operator
- Tampa Electric Co
- Location
- Hillsborough County, Florida
- Balancing authority
- TEC
- Sector
- Electric Utility
- Capacity
- Approved: 75.0 MW
- EIA plant ID
- 70454
Location
27.7950, -82.4030
Nearby power plants
- Big BendGas power plants · 1,797 MW · 0.1 mi
- Big Bend Floating Solar ISolar farms · 1.0 MW · 0.7 mi
- Big Bend AgrivoltaicsSolar farms · 1.0 MW · 0.9 mi
- Big Bend II SolarSolar farms · 45.8 MW · 1.2 mi
- Big Bend 1 Solar and Battery StorageSolar farms, Battery storage · 32.4 MW · 1.3 mi
- Mosaic Co Tampa FacilityOther power plants · 72.4 MW · 4.6 mi
- Little Manatee River SolarSolar farms · 74.5 MW · 7.2 mi
- Bayside Battery StorageBattery storage · 20.0 MW · 7.8 mi
- H L Culbreath Bayside Power StationGas power plants · 2,294 MW · 7.8 mi
- South Tampa Resilience ProjectGas power plants · 75.2 MW · 8.4 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem