Cancelled power plants in the USA — page 22
Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Operating14,656plants
Operating capacity1,406.5 GWnameplate
Under construction97.9 GW849 plants
Whole pipeline290.2 GWplanned, approved and building
Map
Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
1,071 plants · page 22 of 22
| Plant | Capacity | Stage |
|---|---|---|
| Elk Basin Gasoline Plant Gas power plants |
0.7 MW | Withdrawn / abandoned |
| Tehachapi Wind Resource I Wind farms |
0.6 MW | Withdrawn / abandoned |
| Alakanuk Oil-fired power plants |
0.5 MW | Withdrawn / abandoned |
| Mill Pond Hydro Hydroelectric plants |
0.5 MW | Withdrawn / abandoned |
| Quinhagak Oil-fired power plants |
0.5 MW | Withdrawn / abandoned |
| Solar Photovoltaic Project #08 Solar farms |
0.5 MW | Withdrawn / abandoned |
| Solar Photovoltaic Project #09 Solar farms |
0.5 MW | Withdrawn / abandoned |
| Solar Photovoltaic Project #10 Solar farms |
0.5 MW | Withdrawn / abandoned |
| Solar Photovoltaic Project #12 Solar farms |
0.5 MW | Withdrawn / abandoned |
| Solar Photovoltaic Project #17 Solar farms |
0.5 MW | Withdrawn / abandoned |
| Solar Photovoltaic Project #18 Solar farms |
0.5 MW | Withdrawn / abandoned |
| Solar Photovoltaic Project #23 Solar farms |
0.5 MW | Withdrawn / abandoned |
| Solar Photovoltaic Project #28 Solar farms |
0.5 MW | Withdrawn / abandoned |
| Ninth Street Hydropower Project Hydroelectric plants |
0.4 MW | Withdrawn / abandoned |
| Dark Sky Energy Center Other power plants |
0.3 MW | Withdrawn / abandoned |
| Ameresco Butte County Bioenergy plants |
0.2 MW | Withdrawn / abandoned |
| Pebbly Beach Generating Station Hybrid Oil-fired power plants |
0.2 MW | Withdrawn / abandoned |
| Four Mile Hydropower Project Hydroelectric plants |
0.1 MW | Withdrawn / abandoned |
| Harvest Wind Energy Project Wind farms |
0.0 MW | Withdrawn / abandoned |
| K Road Calico Solar Solar farms |
0.0 MW | Withdrawn / abandoned |
| Summit Lake Wind Energy Project Wind farms |
0.0 MW | Withdrawn / abandoned |
Page 22 of 22
← Previous
Operating capacity by state
Click a state to drill down.
AK3GWME6.1GWVT898MWNH4.2GWWA31GWID6.7GWMT7.6GWND11GWMN20GWIL53GWWI20GWMI36GWNY44GWRI2.6GWMA14GWOR19GWNV19GWWY13GWSD7.7GWIA25GWIN34GWOH36GWPA52GWNJ18GWCT10GWCA109GWUT12GWCO24GWNE12GWMO24GWKY22GWWV16GWVA32GWMD14GWDE3GWAZ45GWNM18GWKS21GWAR19GWTN24GWNC40GWSC27GWDC72MWOK37GWLA29GWMS18GWAL33GWGA43GWHI3.7GWTX205GWFL80GW
Capacity by technology
Solid: operating. Light: planned or under construction.
- Gas power plants578.4 GW · +71.1 GW pipeline
- Solar farms172.0 GW · +122.2 GW pipeline
- Wind farms166.9 GW · +23.5 GW pipeline
- Coal power plants179.2 GW
- Battery storage56.1 GW · +64.2 GW pipeline
- Nuclear power plants102.7 GW · +4,968 MW pipeline
- Hydroelectric plants101.1 GW · +3,031 MW pipeline
- Oil-fired power plants31.0 GW · +174 MW pipeline
- Bioenergy plants12.0 GW · +211 MW pipeline
- Geothermal plants3,868 MW · +114 MW pipeline
- Other power plants3,235 MW · +639 MW pipeline
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Luminant Generation Company LLC11 plants · 7,776 MW
- Solar Proponent LLC6 plants · 5,124 MW
- Seminole Electric Cooperative Inc4 plants · 4,124 MW
- Duke Energy Progress - (NC)5 plants · 4,007 MW
- Florida Power & Light Co4 plants · 3,939 MW
- Tampa Electric Co7 plants · 3,859 MW
- Duke Energy Indiana, LLC1 plants · 3,685 MW
- Duke Energy Florida, LLC2 plants · 3,534 MW
- Southern Power Co5 plants · 2,940 MW
- Georgia Power Co6 plants · 2,735 MW
- Dominion Energy South Carolina, Inc4 plants · 2,710 MW
- Nevada Power Co3 plants · 2,580 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map