🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Solar farms › California

SOLAR FARMS

K Road Calico Solar

K Road Calico Solar is a 0.0 MW cancelled solar farm in SAN BERNARDINO County, California, operated by K Road Calico Solar, LLC.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore solar farms in California

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
01Solar Photovoltaic0.0 MW Cancelled or postponed
02Solar Photovoltaic0.0 MW Cancelled or postponed

Plant details

Operator
K Road Calico Solar, LLC
Location
SAN BERNARDINO County, California
Balancing authority
CISO
Sector
IPP Non-CHP
Capacity
Cancelled: 0.0 MW
EIA plant ID
57416

Location

34.7886, -116.4528

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem