Summit Lake Wind Energy Project

Summit Lake Wind Energy Project is a 0.0 MW cancelled wind farm in Baraga County, Michigan, operated by Summit Lake Wind, LLC.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore wind farms in Michigan

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
1Onshore Wind Turbine0.0 MW Cancelled or postponed

Plant details

Operator
Summit Lake Wind, LLC
Location
Baraga County, Michigan
Balancing authority
MISO
Sector
IPP Non-CHP
Capacity
Cancelled: 0.0 MW
EIA plant ID
61812

Location

46.7487, -88.1745

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem