πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· SPP

Onshore wind project GEN-2002-021, Gray County

Onshore wind project GEN-2002-021, Gray County is a 160 MW onshore wind request withdrawn in the SPP interconnection queue, in Gray County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2002 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2002-021
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Location
Gray County, Texas
Technology
Wind: 160 MW
Total requested
160 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
12 September 2002
Proposed online date
November 2005

Location

Marker shows the centre of Gray County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Gray County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem