ONSHORE WIND Β· PJMOnshore wind project Z1-042, Mifflin County
Onshore wind project Z1-042, Mifflin County is a 46.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Mifflin County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2013 (completed)
- Withdrawn / abandonedNov 2014 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Z1-042
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Belleville/New Holland-Logan 46kV
- Location
- Mifflin County, Pennsylvania
- Technology
- Wind: 46.0 MW
- Total requested
- 46.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 16 August 2013
- Proposed online date
- December 2015
- Withdrawn
- November 2014
Location
Marker shows the centre of Mifflin County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Mifflin County
- Gas project Z1-047, Mifflin CountyGas Β· 464 MW Β· withdrawn
- Onshore wind project Y2-087, Mifflin CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project S44, Mifflin CountyOnshore wind Β· 110 MW Β· withdrawn
- Onshore wind project X1-018, Mifflin CountyOnshore wind Β· 75.0 MW Β· withdrawn
- Solar project AF2-147, Mifflin CountySolar Β· 13.1 MW Β· withdrawn
- Solar project V4-077, Mifflin CountySolar Β· 13.0 MW Β· withdrawn
- Solar project AH1-445, Mifflin CountySolar Β· 10.0 MW Β· withdrawn
- Solar project AF2-231, Mifflin CountySolar Β· 5.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem