Onshore wind project S44, Mifflin County

Onshore wind project S44, Mifflin County is a 110 MW onshore wind request withdrawn in the PJM interconnection queue, in Mifflin County, Pennsylvania, connecting to PENELEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2007 (completed)
  2. Withdrawn / abandonedOct 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
S44
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
Mifflin County
Location
Mifflin County, Pennsylvania
Technology
Wind: 110 MW
Total requested
110 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
18 May 2007
Proposed online date
December 2009
Withdrawn
October 2008

Location

Marker shows the centre of Mifflin County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Mifflin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem