United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
SOLAR Β· MISOSolar project J1061, Wabasha County
Solar project J1061, Wabasha County is a 300 MW solar request withdrawn in the MISO interconnection queue, in Wabasha County, Minnesota, connecting to NORTHERN STATES POWER COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedMar 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1061
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- NORTHERN STATES POWER COMPANY
- Connection point (POI)
- Briggs Rd - N. Rochester 345 kV Line Tap
- Location
- Wabasha County, Minnesota
- Technology
- Solar: 300 MW
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- October 2021
- Withdrawn
- March 2020
Location
Marker shows the centre of Wabasha County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Wabasha County
- Battery storage project J3848, Wabasha CountyBattery storage Β· 250 MW Β· in study
- Battery storage project J2601, Wabasha CountyBattery storage Β· 200 MW Β· in study
- Solar project J2867, Wabasha CountySolar Β· 50.0 MW Β· in study
- Solar project J2600, Wabasha CountySolar Β· 245 MW Β· withdrawn
- Battery storage project J1032, Wabasha CountyBattery storage Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem