United States › Grid › Interconnection queues › Minnesota

BATTERY STORAGE · MISO

Battery storage project J3848, Wabasha County

Battery storage project J3848, Wabasha County is a 250 MW battery storage request in interconnection study in the MISO interconnection queue, in Wabasha County, Minnesota, connecting to DAIRYLAND POWER COOPERATIVE.

Queue statusIn planning
  1. PlanningQueued Dec 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2030 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
J3848
Grid region
MISO (Midcontinent)
Utility / transmission owner
DAIRYLAND POWER COOPERATIVE
Connection point (POI)
Wabaco
Location
Wabasha County, Minnesota
Technology
Battery: 250 MW
Total requested
250 MW
Service type
Network resource (NRIS)
Queue status
Active
Entered queue
31 December 2024
Proposed online date
June 2030

Location

Marker shows the centre of Wabasha County; the queue data does not give exact sites.

Power plants in Minnesota · Transmission lines in Minnesota

Other requests in Wabasha County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem