BATTERY STORAGE · MISOBattery storage project J2601, Wabasha County
Battery storage project J2601, Wabasha County is a 200 MW battery storage request in interconnection study in the MISO interconnection queue, in Wabasha County, Minnesota, connecting to NORTHERN STATES POWER COMPANY.
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2601
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- NORTHERN STATES POWER COMPANY
- Connection point (POI)
- North Rochester - Briggs Road 345.0kV
- Location
- Wabasha County, Minnesota
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 15 September 2022
- Proposed online date
- June 2026
Location
Marker shows the centre of Wabasha County; the queue data does not give exact sites.
Other requests in Wabasha County
- Battery storage project J3848, Wabasha CountyBattery storage · 250 MW · in study
- Solar project J2867, Wabasha CountySolar · 50.0 MW · in study
- Solar project J1061, Wabasha CountySolar · 300 MW · withdrawn
- Solar project J2600, Wabasha CountySolar · 245 MW · withdrawn
- Battery storage project J1032, Wabasha CountyBattery storage · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem