SOLAR Β· MISO

Solar project J2600, Wabasha County

Solar project J2600, Wabasha County is a 245 MW solar request withdrawn in the MISO interconnection queue, in Wabasha County, Minnesota, connecting to DAIRYLAND POWER COOPERATIVE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2600
Grid region
MISO (Midcontinent)
Utility / transmission owner
DAIRYLAND POWER COOPERATIVE
Connection point (POI)
Wabaco to Alma 161 kV Tap
Location
Wabasha County, Minnesota
Technology
Solar: 245 MW
Total requested
245 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
14 September 2022
Proposed online date
June 2026
Withdrawn
October 2025

Location

Marker shows the centre of Wabasha County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Wabasha County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem