United States › Grid › Interconnection queues › North Dakota
ONSHORE WIND · MISOOnshore wind project MPC00300, Cavalier County
Onshore wind project MPC00300, Cavalier County is a 40.5 MW onshore wind request built and operating in the MISO interconnection queue, in Cavalier County, North Dakota, connecting to Minnkota Power Cooperative.
Request details
- Queue ID
- MPC00300
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Minnkota Power Cooperative
- Connection point (POI)
- Langdon 115 kV Substation
- Location
- Cavalier County, North Dakota
- Technology
- Wind: 40.5 MW
- Total requested
- 40.5 MW
- Service type
- Energy only (ERIS)
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 31 July 2007
- Proposed online date
- December 2008
- Came online
- December 2008
Location
Marker shows the centre of Cavalier County; the queue data does not give exact sites.
Power plants in North Dakota · Transmission lines in North Dakota
Other requests in Cavalier County
- Onshore wind project MPC00100, Cavalier CountyOnshore wind · 99.0 MW · built
- Onshore wind project MPC00200, Cavalier CountyOnshore wind · 60.0 MW · built
- Onshore wind project G651, Cavalier CountyOnshore wind · 115 MW · withdrawn
- Onshore wind project G845, Cavalier CountyOnshore wind · 60.0 MW · withdrawn
- Onshore wind project G314, Cavalier CountyOnshore wind · 50.0 MW · withdrawn
- Onshore wind project J1763, Cavalier CountyOnshore wind · 33.0 MW · withdrawn
- Onshore wind project MPC03400, Cavalier CountyOnshore wind · 9.5 MW · withdrawn
- Onshore wind project MPC03500, Cavalier CountyOnshore wind · 3.2 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem