United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
ONSHORE WIND Β· MISOOnshore wind project G845, Cavalier County
Onshore wind project G845, Cavalier County is a 60.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Cavalier County, North Dakota.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2007 (completed)
- Withdrawn / abandonedSep 2008 (project stopped here)
- ConsentedSep 2008 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G845
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Langdon 115 kV Substation
- Location
- Cavalier County, North Dakota
- Technology
- Wind: 60.0 MW
- Total requested
- 60.0 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 28 August 2007
- Agreement signed
- 25 September 2008
- Proposed online date
- December 2011
- Withdrawn
- September 2008
Location
Marker shows the centre of Cavalier County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Cavalier County
- Onshore wind project MPC00100, Cavalier CountyOnshore wind Β· 99.0 MW Β· built
- Onshore wind project MPC00200, Cavalier CountyOnshore wind Β· 60.0 MW Β· built
- Onshore wind project MPC00300, Cavalier CountyOnshore wind Β· 40.5 MW Β· built
- Onshore wind project G651, Cavalier CountyOnshore wind Β· 115 MW Β· withdrawn
- Onshore wind project G314, Cavalier CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Onshore wind project J1763, Cavalier CountyOnshore wind Β· 33.0 MW Β· withdrawn
- Onshore wind project MPC03400, Cavalier CountyOnshore wind Β· 9.5 MW Β· withdrawn
- Onshore wind project MPC03500, Cavalier CountyOnshore wind Β· 3.2 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem