United States β€Ί Grid β€Ί Interconnection queues β€Ί North Dakota

ONSHORE WIND Β· MISO

Onshore wind project G845, Cavalier County

Onshore wind project G845, Cavalier County is a 60.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Cavalier County, North Dakota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2007 (completed)
  2. Withdrawn / abandonedSep 2008 (project stopped here)
  3. ConsentedSep 2008 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G845
Grid region
MISO (Midcontinent)
Connection point (POI)
Langdon 115 kV Substation
Location
Cavalier County, North Dakota
Technology
Wind: 60.0 MW
Total requested
60.0 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
28 August 2007
Agreement signed
25 September 2008
Proposed online date
December 2011
Withdrawn
September 2008

Location

Marker shows the centre of Cavalier County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Cavalier County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem