πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί North Dakota

ONSHORE WIND Β· MISO

Onshore wind project MPC03400, Cavalier County

Onshore wind project MPC03400, Cavalier County is a 9.5 MW onshore wind request withdrawn in the MISO interconnection queue, in Cavalier County, North Dakota, connecting to Minnkota Power Cooperative.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
MPC03400
Grid region
MISO (Midcontinent)
Utility / transmission owner
Minnkota Power Cooperative
Connection point (POI)
Langdon 115 kV Substation
Location
Cavalier County, North Dakota
Technology
Wind: 9.5 MW
Total requested
9.5 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
1 December 2016
Proposed online date
January 2018

Location

Marker shows the centre of Cavalier County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Cavalier County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem