BATTERY STORAGE · NYISOBeck Storage
Beck Storage is a 85.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Chautauqua County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C24-267
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- ACE DevCo NC LLC
- Connection point (POI)
- Moon Road-Hartfield Line 159 115 kV
- Location
- Chautauqua County, New York
- Technology
- Battery: 85.0 MW
- Total requested
- 85.0 MW
- Queue status
- Withdrawn
- Entered queue
- 23 September 2024
Location
Marker shows the centre of Chautauqua County; the queue data does not give exact sites.
Other requests in Chautauqua County
- South Ripley Solar and BESSSolar + storage · 270 MW · in study
- Lighthouse Energy StorageBattery storage · 250 MW · in study
- Basecamp BESSBattery storage · 170 MW · in study
- York Run SolarSolar · 90.0 MW · in study
- Dewdrop WindOnshore wind · 62.0 MW · in study
- Buttercup WindOnshore wind · 49.9 MW · in study
- Goldenrod WindOnshore wind · 39.0 MW · in study
- Cassadaga WindOnshore wind · 127 MW · built
- Cassadaga WindOnshore wind · 127 MW · built
- Ball Hill WindOnshore wind · 103 MW · built
- Ball Hill WindOnshore wind · 103 MW · built
- Arkwright SummitOnshore wind · 78.4 MW · built