πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· ERCOT

Sitges Wind 2

Sitges Wind 2 is a 300 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Motley County, Texas.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedFeb 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
29INR0112
Grid region
ERCOT (Texas)
Developer
NextEra Energy Interconnection Holdings, LLC
Connection point (POI)
Tap 345kV 59904 Cottonwood to 23922 White River Ckt 2
Location
Motley County, Texas
Technology
Wind: 300 MW
Total requested
300 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
January 2029
Withdrawn
February 2025

Location

Marker shows the centre of Motley County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Motley County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem