United States βΊ Grid βΊ Interconnection queues βΊ New York
SOLAR Β· NYISOYork Solar
York Solar is a 24.9 MW solar request withdrawn in the NYISO interconnection queue, in Livingston County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2018 (completed)
- Withdrawn / abandonedNov 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 725
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- York Solar, LLC
- Connection point (POI)
- Line #863 - 69kV
- Location
- Livingston County, New York
- Technology
- Solar: 24.9 MW
- Total requested
- 24.9 MW
- Queue status
- Withdrawn
- Entered queue
- 8 June 2018
- Withdrawn
- November 2018
Location
Marker shows the centre of Livingston County; the queue data does not give exact sites.
Other requests in Livingston County
- Horseshoe SolarSolar Β· 180 MW Β· in study
- White Creek SolarSolar Β· 135 MW Β· in study
- Hatchery SolarSolar Β· 20.0 MW Β· in study
- Highbanks SolarSolar Β· 12.5 MW Β· in study
- Hyland LandfillOther Β· 6.4 MW Β· built
- Russet Ridge WindOnshore wind Β· 118 MW Β· withdrawn
- Morris Sole SolarSolar Β· 110 MW Β· withdrawn
- White Creek SolarSolar Β· 100 MW Β· withdrawn
- Morris Ridge Battery StorageBattery storage Β· 83.0 MW Β· withdrawn
- Orion LivingstonOnshore wind Β· 75.0 MW Β· withdrawn
- Leicester WindOnshore wind Β· 57.0 MW Β· withdrawn
- BishopOnshore wind Β· 23.1 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem