United States βΊ Grid βΊ Interconnection queues βΊ New York
ONSHORE WIND Β· NYISOBishop
Bishop is a 23.1 MW onshore wind request withdrawn in the NYISO interconnection queue, in Livingston County, New York, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2003 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 0141A
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Atlantic Renewable Energy Corp.
- Connection point (POI)
- Springwater 34.5kV line
- Location
- Livingston County, New York
- Technology
- Wind: 23.1 MW
- Total requested
- 23.1 MW
- Queue status
- Withdrawn
- Entered queue
- 9 September 2003
Location
Marker shows the centre of Livingston County; the queue data does not give exact sites.
Other requests in Livingston County
- Horseshoe SolarSolar Β· 180 MW Β· in study
- White Creek SolarSolar Β· 135 MW Β· in study
- Hatchery SolarSolar Β· 20.0 MW Β· in study
- Highbanks SolarSolar Β· 12.5 MW Β· in study
- Hyland LandfillOther Β· 6.4 MW Β· built
- Russet Ridge WindOnshore wind Β· 118 MW Β· withdrawn
- Morris Sole SolarSolar Β· 110 MW Β· withdrawn
- White Creek SolarSolar Β· 100 MW Β· withdrawn
- Morris Ridge Battery StorageBattery storage Β· 83.0 MW Β· withdrawn
- Orion LivingstonOnshore wind Β· 75.0 MW Β· withdrawn
- Leicester WindOnshore wind Β· 57.0 MW Β· withdrawn
- York SolarSolar Β· 24.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem