GAS Β· NYISOBowline Point Unit 3
Bowline Point Unit 3 is a 750 MW gas request withdrawn in the NYISO interconnection queue, in Rockland County, New York, connecting to CONED.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 1999 (completed)
- Withdrawn / abandonedJul 2006 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 29
- Grid region
- NYISO (New York)
- Utility / transmission owner
- CONED
- Developer
- Mirant
- Connection point (POI)
- W. Haverstraw 345kV
- Location
- Rockland County, New York
- Technology
- Gas: 750 MW
- Total requested
- 750 MW
- Queue status
- Withdrawn
- Entered queue
- 13 October 1999
- Withdrawn
- July 2006
Location
Marker shows the centre of Rockland County; the queue data does not give exact sites.
Other requests in Rockland County
- Riverbank Power GBattery storage Β· 1,000 MW Β· withdrawn
- Bowline Gen. Station Unit #3Gas Β· 814 MW Β· withdrawn
- Braen Energy Storage Phase 1Battery storage Β· 500 MW Β· withdrawn
- Ramapo Storage Project 2Battery storage Β· 500 MW Β· withdrawn
- Braen Energy Storage ProjectBattery storage Β· 500 MW Β· withdrawn
- Braen Energy Storage Phase 1Battery storage Β· 500 MW Β· withdrawn
- Ramapo Storage Project 1Battery storage Β· 500 MW Β· withdrawn
- Hudson Valley Data CenterOther Β· 50.0 MW Β· withdrawn
- Hillburn Energy StorageBattery storage Β· 10.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem