United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOHillburn Energy Storage
Hillburn Energy Storage is a 10.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Rockland County, New York, connecting to O&R.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedNov 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1252
- Grid region
- NYISO (New York)
- Utility / transmission owner
- O&R
- Developer
- Alliance Energy Storage, LLC
- Connection point (POI)
- Hillburn
- Location
- Rockland County, New York
- Technology
- Battery: 10.0 MW
- Total requested
- 10.0 MW
- Queue status
- Withdrawn
- Entered queue
- 15 September 2021
- Withdrawn
- November 2021
Location
Marker shows the centre of Rockland County; the queue data does not give exact sites.
Other requests in Rockland County
- Riverbank Power GBattery storage · 1,000 MW · withdrawn
- Bowline Gen. Station Unit #3Gas · 814 MW · withdrawn
- Bowline Point Unit 3Gas · 750 MW · withdrawn
- Braen Energy Storage Phase 1Battery storage · 500 MW · withdrawn
- Ramapo Storage Project 2Battery storage · 500 MW · withdrawn
- Braen Energy Storage ProjectBattery storage · 500 MW · withdrawn
- Braen Energy Storage Phase 1Battery storage · 500 MW · withdrawn
- Ramapo Storage Project 1Battery storage · 500 MW · withdrawn
- Hudson Valley Data CenterOther · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem