United States › Grid › Interconnection queues › New York

BATTERY STORAGE · NYISO

Braen Energy Storage Phase 1

Braen Energy Storage Phase 1 is a 500 MW battery storage request withdrawn in the NYISO interconnection queue, in Rockland County, New York, connecting to ConEd.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
C24-089
Grid region
NYISO (New York)
Utility / transmission owner
ConEd
Developer
Braen Energy LLC
Connection point (POI)
Ramapo 345kV Substation
Location
Rockland County, New York
Technology
Battery: 500 MW
Total requested
500 MW
Queue status
Withdrawn
Entered queue
14 August 2024

Location

Marker shows the centre of Rockland County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Rockland County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem