United States βΊ Grid βΊ Interconnection queues βΊ Oregon
ONSHORE WIND Β· WESTIb
Ib is a 200 MW onshore wind request withdrawn in the West interconnection queue, in Gilliam County, Oregon, connecting to Avangrid Power, LLC.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2002 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G107
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Avangrid Power, LLC
- Developer
- Avangrid Power, LLC
- Connection point (POI)
- Near Slatt 500kV Substation
- Location
- Gilliam County, Oregon
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 24 June 2002
- Proposed online date
- January 2004
Location
Marker shows the centre of Gilliam County; the queue data does not give exact sites.
Other requests in Gilliam County
- Other project G0768, Gilliam CountyOther Β· 600 MW Β· in study
- Solar + storage project G0989, Gilliam CountySolar + storage Β· 550 MW Β· in study
- Onshore wind project G0344, Gilliam CountyOnshore wind Β· 488 MW Β· in study
- Battery storage project G0941, Gilliam CountyBattery storage Β· 488 MW Β· in study
- Onshore wind project G0362, Gilliam CountyOnshore wind Β· 204 MW Β· in study
- Onshore wind project G0363, Gilliam CountyOnshore wind Β· 204 MW Β· in study
- Onshore wind project G1074, Gilliam CountyOnshore wind Β· 111 MW Β· in study
- Onshore wind project G0917, Gilliam CountyOnshore wind Β· 90.3 MW Β· in study
- Battery storage project G0709, Gilliam CountyBattery storage Β· 41.0 MW Β· in study
- Onshore wind project 10-037, Gilliam CountyOnshore wind Β· 500 MW Β· suspended
- Onshore wind project 09-035, Gilliam CountyOnshore wind Β· 401 MW Β· suspended
- Onshore wind project 11-040, Gilliam CountyOnshore wind Β· 200 MW Β· suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem