United States › Grid › Interconnection queues › Oregon

HYDRO · WEST

McKenzie Reservoir Hydroelectric Facility

McKenzie Reservoir Hydroelectric Facility is a 1.0 MW hydro request built and operating in the West interconnection queue, in Deschutes County, Oregon, connecting to Three Sisters Irrigation District.

Queue statusOperating
  1. PlanningQueued Aug 2017 (completed)
  2. ConsentedJun 2020 (completed)
  3. Construction (completed)
  4. OperatingTarget Sep 2018 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
G0574
Grid region
West (non-ISO utilities)
Utility / transmission owner
Three Sisters Irrigation District
Connection point (POI)
Holmes Road GPS 44 18'45.45"N, 121 25'25.38"W
Location
Deschutes County, Oregon
Technology
Hydro: 1.0 MW
Total requested
1.0 MW
Service type
Energy only (ERIS)
Study phase
IA Executed
Queue status
Operational
Entered queue
4 August 2017
Agreement signed
24 June 2020
Proposed online date
September 2018

Location

Marker shows the centre of Deschutes County; the queue data does not give exact sites.

Power plants in Oregon · Transmission lines in Oregon

Other requests in Deschutes County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem