United States βΊ Grid βΊ Interconnection queues βΊ Indiana
BATTERY STORAGE Β· MISOBattery storage project J1704, Shelby County
Battery storage project J1704, Shelby County is a 50.0 MW battery storage request withdrawn in the MISO interconnection queue, in Shelby County, Indiana, connecting to DUKE ENERGY INDIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedNov 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1704
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- DUKE ENERGY INDIANA
- Connection point (POI)
- Gwynneville 345kV Substation
- Location
- Shelby County, Indiana
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 25 June 2020
- Proposed online date
- September 2023
- Withdrawn
- November 2023
Location
Marker shows the centre of Shelby County; the queue data does not give exact sites.
Other requests in Shelby County
- Solar project J805, Shelby CountySolar Β· 199 MW Β· under construction
- Gas project J259, Shelby CountyGas Β· 1,065 MW Β· withdrawn
- Gas project J250, Shelby CountyGas Β· 999 MW Β· withdrawn
- Other project G088, Shelby CountyOther Β· 350 MW Β· withdrawn
- Solar + storage project J1756, Shelby CountySolar + storage Β· 309 MW Β· withdrawn
- Blue River StorageBattery storage Β· 300 MW Β· withdrawn
- Solar project J1829, Shelby CountySolar Β· 180 MW Β· withdrawn
- Solar project J1699, Shelby CountySolar Β· 43.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem